170T 48M Segmental Launching Girder Method
Launching girder method is one very popular method in the bridge construction with launching gantry. Shenghua Heavy Crane Group provide full span launching gantry, overhead segmental launching gantry and underslung segmental launching gantry, etc.
In the year 2011, our dsigned and manufactured 170T 48M Segmental Launching Gantry had provide in Jinshan Yellow River Railway Bridge to CREC SHANGHAI CIVIL ENGINEERING.
Details:
Client: CREC SHANGHAI CIVIL ENGINEERING
Project: Jinshan Yellow River Railway Bridge
Year of Manufacture:2011
Number of Sets: 1
Characteristics:
Max span length:48m
Winch lifting capacity:170 ton
Max suspension weight:1700 ton
Total Length of the equipment:168m
Accommodation curve:≥2500m
Max transversal slope:≤2.5%
Max longitudinal slope:≤3.5%
Speed:
Lifting speed with load:0~2m/min
Lifting speed Without Load:0~5m/min
Travelling:0~15m/min